Home›Repair guides›Cummins/Onan›Replacing SCRs and CRs

Cummins/Onan — Replacing SCRs and CRs

Repair & overhaul · SCRs and diodes

From a Cummins/Onan service manual covering: 300.0 DFT, 350.0 DFU, 350.0 WF, 400.0 DFV, 400.0 WK, 450.0 DFW, 500.0 DFY, 600.0 DWV. Check it applies to your exact model before use.

Applies to: Cummins/Onan YB series

Before you start

  • Use a 40 watt soldering iron. Hold a needlenose pliers between rectifier and soldering point to prevent destructive heating.
  • Excessive heat on these components will destroy them.

Procedure

  1. Unsolder leadwires from terminals.
  2. Use proper size wrenches to hold body while removing nut.
  3. Push rectifier free of mounting hole in heat sink.
  4. Insert new rectifier into mounting hole. Secure with nut and washer.
  5. Torque diodes on rotating exciter assembly to 15 lb-in (1.7 N·m).
  6. Solder leadwires to new rectifiers.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • 15 lb-in (1.7 N·m)

Full service-parts list: Cummins/Onan YB series →

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →