Home›Repair guides›Cummins/Onan›Pressure Regulator - Remove and Install

Cummins/Onan — Pressure Regulator - Remove and Install

Repair & overhaul

From a Cummins/Onan service manual covering: E124V, E125, E140. Check it applies to your exact model before use.

Applies to: Onan Corporation (Cummins Power Generation) E124V, Onan Corporation (Cummins Power Generation) E140

Procedure

  1. Disconnect and connect fuel lines and clamps
  2. Remove and install speed control assembly
  3. Re-adjust governor speed
  4. Test run engine

Specs & values

  • SRT 05-1AG
  • 0.3 hour

Full service-parts list: Onan Corporation (Cummins Power Generation) E124V →, Onan Corporation (Cummins Power Generation) E140 →

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →