Cummins/Onan M-1902s — Installation of Genset Control Box
Installation
For the Cummins/Onan M-1902s, from the Cummins/Onan service manual.
Applies to: Cummins/Onan HDKA, Kubota V1505-E3BG engine
Before you start
- Failure to mount control box below 160°F (71.1°C) may cause equipment damage or failure.
- If using isolators, use toothed washers to prevent rotation.
Procedure
- Locate control box in low-vibration area with maximum accessibility.
- Unscrew bolts from the four vibration isolators supporting the control box.
- Drill holes of appropriate size and place box into position, leaving room for harness connectors.
- Mount toothed washers under the vibration isolators to prevent rotation.
- Plug the J2 (largest) and J1 harness connectors into the control box.
- Route harnesses against the compartment walls, away from sharp edges.
Tools required
- drill Amazon
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Specs & values
- Control box must be mounted where temperature is less than 160°F (71.1°C)
- Use J2 harness (largest connector) to engine; J1 harness to AC control box; J3 to remote control
Full service-parts list: Cummins/Onan HDKA →, Kubota V1505-E3BG engine →
Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.