Home›Repair guides›Cummins/Onan›Installation Checklist - Prestart

Cummins/Onan — Installation Checklist - Prestart

Installation · generator set

From a Cummins/Onan service manual — check it applies to your exact model before use.

Applies to: Cummins/Onan GGHG, Cummins/Onan GGHH, Cummins/Onan V-10 WSG-1068 engine

Before you start

  • Improper wiring can cause a fire or electrocution.

Procedure

  1. Verify wattage capacity sufficient for anticipated load.
  2. Verify at least 3 feet clearance around generator set.
  3. Verify genset located away from flooding.
  4. Check fuel tanks, lines and shutoff valves meet codes and are free of leaks.
  5. Check exhaust system for leaks, secure connections, condensation drain, insulation.
  6. Check AC and DC wiring sizes, insulation, conduits and connections meet codes.
  7. Service engine with oil and coolant.
  8. Verify batteries installed, serviced and charged.

Full service-parts list: Cummins/Onan GGHG →, Cummins/Onan GGHH →

Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Cummins/Onan repair guides →