Cummins/Onan — Connecting Rod Service
Repair & overhaul · Connecting rods
From a Cummins/Onan service manual — check it applies to your exact model before use.
Applies to: Cummins/Onan MCCK
Procedure
- Service connecting rods at same time pistons or rods are serviced; rods must be removed with piston.
- Replaceable bushings and bearings are used; proper clearance obtained by replacing pin bushing and bearings.
- Rod bearings are precision size and require no reaming.
- Install connecting rods and caps with raised lines (witness marks) aligned and caps facing toward oil base.
- Rod and cap numbered 2 fits on crankshaft journal nearest bearing plate.
- Coat crankshaft journal bearing surfaces with oil before installing rods.
- Crank engine by hand to see rods are free; if necessary, rap connecting rod cap screws sharply with soft-faced hammer to set rod square.
- Checking bearing clearance with Plastigage: place correct size Plastigage in bearing cap full width about 1/4 inch (6.35 mm) off center.
- Rotate crank about 30 degrees from bottom dead center and reinstall bearing cap.
- Tighten bolts to torque specified in ASSEMBLY TORQUES section. Do not turn crankshaft.
- Remove bearing cap, leave flattened Plastigage on part, compare widest point with graduations on envelope.
Tools required
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Specs & values
- Plastigage placement: about 1/4 inch (6.35 mm) off center
- Tighten bolts to torque specified in ASSEMBLY TORQUES section
Full service-parts list: Cummins/Onan MCCK →
Source: Cummins/Onan service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.