Cummins/Onan 205AJ — Starting the remote control plant electrically
Operation
For the Cummins/Onan 205AJ, from the Cummins/Onan operator's manual.
Applies to: Cummins/Onan AJ series
Procedure
- Before first start or after running out of fuel, work fuel pump primer lever or crank until carburetor fills, about 30 revolutions.
- Push START-STOP toggle switch to START.
- Carburetor is automatically choked.
- If plant does not start after a few crankings of about 5 seconds each, check fuel and ignition systems.
- Release start switch as soon as plant starts; ensure it returns to center.
- Check each remote control switch in START and STOP positions.
Full service-parts list: Cummins/Onan AJ series →
Source: Cummins/Onan operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.