Cummins/Onan 205AJ — Connecting the load - remote control plant
Operation
For the Cummins/Onan 205AJ, from the Cummins/Onan operator's manual.
Applies to: Cummins/Onan AJ series
Before you start
- Continuous overloading may damage generator windings.
Procedure
- Allow plant to warm up thoroughly before connecting heavy load.
- Throw main line switch to ON; if no main line switch, throw individual load switch ON.
- Apply portions of load in steps when possible.
Full service-parts list: Cummins/Onan AJ series →
Source: Cummins/Onan operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.