Cummins/Onan 205AJ — Connecting the load - manual type plant
Operation
For the Cummins/Onan 205AJ, from the Cummins/Onan operator's manual.
Applies to: Cummins/Onan AJ series
Procedure
- Insert load plug into receptacle at side of generator.
- Turn plug slightly right to lock.
- Provide a ground on the plant if tools or appliances have a third wire for grounding.
- Throw individual load switch ON.
Full service-parts list: Cummins/Onan AJ series →
Source: Cummins/Onan operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.