Caterpillar SR4B — Leads to Terminal Strip Connection
Installation · Terminals
For the Caterpillar SR4B, from the Caterpillar service manual.
Applies to: Caterpillar SR4B
Procedure
- When multiple leads attach to bus bar, place on alternate sides
- Use flat plated washers under bolt head and nut
- Group all generator phase leads together after connection
- Tie phase leads together with cable straps
- Maintain minimum 25 mm clearance between phase-to-phase connections
Tools required
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Specs & values
- Minimum 25 mm clearance
Full service-parts list: Caterpillar SR4B →
Source: Caterpillar service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.