Procedure

  1. Turn the main distribution panel circuit breaker feeding the transfer switch to the OFF position
  2. Observe system's automatic sequence initiation
  3. To return to utility power, turn the main distribution panel circuit breaker to the ON position

Specs & values

  • Utility Fail: Generator senses utility voltage below 70% of nominal; engine start sequence initiates after 6 second time delay
  • Engine Warm-Up: Select 20 or 50 second delay using jumper on control board
  • Transfer: Occurs after voltage exceeds set levels; minimum 5 minute engine run time after transfer
  • Engine Cool Down: Engine runs 60 seconds after retransfer

Source: Briggs & Stratton service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.