Briggs & Stratton — Supervisory Control Wiring Setup
Installation · Control module
From a Briggs & Stratton service manual — check it applies to your exact model before use.
Browse Briggs & Stratton generators & specs →
Procedure
- If generator is in area regularly below 40°F (4°C), select 50 second warm up by moving jumper on JP2 from '20' to '50' position
- Place 2 position switch to 'NG' or 'LP' as appropriate
- Place 3 position switch to match KW rating of installed generator
- Connect terminals A-A (24 VAC, air conditioner contactor control) in series with A/C contactor control circuit
- Connect terminals B-B (1 Amp 125 VAC) in series with installer-supplied contactor for a large load
- Tighten all wire connections/fasteners to proper torque per enclosure label
Source: Briggs & Stratton service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.