Briggs & Stratton 030241 — Connecting Electrical Loads
Operation · generator
For the Briggs & Stratton 030241, from the Briggs & Stratton owner's manual.
Browse Briggs & Stratton generators & specs →
Procedure
- Let engine stabilize and warm up for a few minutes after starting.
- Plug in and turn on the desired 120 and/or 240 Volt AC, single phase, 60 Hz electrical loads.
- DO NOT connect 240 Volt loads to the 120 Volt duplex receptacles.
- DO NOT connect 3–phase loads to the generator.
- DO NOT connect 50 Hz loads to the generator.
- DO NOT OVERLOAD THE GENERATOR.
Source: Briggs & Stratton owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.