Home›Repair guides›Baldor›Post Installation Checks

Baldor — Post Installation Checks

Installation · Complete generator set

From a Baldor service manual covering: GLC100, GLC125, GLC30, GLC35, GLC45, GLC50, GLC60, GLC80, MN2408. Check it applies to your exact model before use.

Applies to: Baldor (Baldor Generators / Baldor Electric Company) GLC100, Baldor (Baldor Generators / Baldor Electric Company) GLC80

Before you start

  • Stop engine immediately if a fuel, coolant or oil leak is detected

Procedure

  1. Verify transfer switch is in Utility Power mode; no power present at generator.
  2. Verify engine starting battery is disconnected.
  3. Verify generator is securely mounted and anchored to its cement pad.
  4. Verify generator and transfer switch are properly grounded.
  5. Verify engine oil and coolant levels are full.
  6. Verify fuel source is ON with correct pressure and flow rate.
  7. Connect battery, start generator and check for fuel/coolant/oil leaks.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Maximum ambient temperature 122°F (50°C)

Full service-parts list: Baldor (Baldor Generators / Baldor Electric Company) GLC100 →, Baldor (Baldor Generators / Baldor Electric Company) GLC80 →

Source: Baldor service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Baldor repair guides →