Home›Repair guides›Westerbeke›Recommissioning

Westerbeke 90A FOUR — Recommissioning

Maintenance · Engine

For the Westerbeke 90A FOUR, from the Westerbeke operator's manual.

Procedure

  1. Remove the oil-soaked cloths from the intake manifold and the thru-hull exhaust port.
  2. Remove the raw water pump cover and gasket and discard the old gasket.
  3. Install the raw water pump impeller and install the raw water pump cover with a new cover gasket.
  4. Reinstall the batteries removed during lay-up and reconnect the battery cables; check that batteries are fully charged.
  5. Check the condition of the zinc anode in the raw water circuit and clean or replace as needed.
  6. Start the engine in accordance with procedures described in the PREPARATIONS FOR STARTING section.

Source: Westerbeke operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Westerbeke repair guides →