HomeRepair guidesINSTALLATION

Transfer Switches - LakeShore — INSTALLATION

A Transfer Switches - LakeShore service procedure — check it applies to your exact model before use.

Browse Transfer Switches - LakeShore generators & specs →

Procedure

  1. 1. To remove unit from enclosure: Push tab on right to swing unit to the left and remove.
  2. 2. Mount the enclosure at eye level using screws or other suitable fastening device. Bring supply and load wires in through bottom or side knockouts. DO NOT USE TOP.
  3. 3. Install 9 volt alkaline battery (not supplied) by sliding battery cover in direction of arrow and removing(located above key pad). Pull out the battery connector and connect the bat-

Source: manual:Styles 2, 3 and T-200 New Manual.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.