Transfer Switches - LakeShore — INSTALLATION
A Transfer Switches - LakeShore service procedure — check it applies to your exact model before use.
Browse Transfer Switches - LakeShore generators & specs →
Procedure
- 1. To remove unit from enclosure: Push tab on right to swing unit to the left and remove.
- 2. Mount the enclosure at eye level using screws or other suitable fastening device. Bring supply and load wires in through bottom or side knockouts. DO NOT USE TOP.
- 3. Install 9 volt alkaline battery (not supplied) by sliding battery cover in direction of arrow and removing(located above key pad). Pull out the battery connector and connect the bat-
Source: manual:Styles 2, 3 and T-200 New Manual.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.