Transfer Switches - LakeShore — IN INSTALLATION AND USE OF THIS PRODUCT, COMPLY WITH
A Transfer Switches - LakeShore service procedure — check it applies to your exact model before use.
Browse Transfer Switches - LakeShore generators & specs →
Procedure
- 1. A wiring diagram for the switch must be available.
- 2. Normal and Emergency voltage and frequency must be available and within the
- 3. Control circuit voltage (if transformers are used) must be 110 to 125 volts.
- 4. Connections to the PFR must be correct and the relay must be adjusted to pick up
- 5. All timers must be turned down or consideration given to them while the tests are
- 6. If trip units are included in the switch, they must be reset if previously tripped due
- 7. All electrical connections must be tight and in accordance with the wiring diagram.
- 8. All components must be free of obvious defects with the exception of normal us-
- 9. The switch must be connected to a good earth ground.
- 1. The control relays and timers
- 2. The molded case switches
- 3. The adjustment of the operating mechanism
- 4. The motor and microswitches
- 1. Maintenance Disconnect Switch (MDS)
- 2. Selector Switch (SS)
- 3. Outage Delay Relay (ODR) Defective
- 4. Engine Batteries Bad
- 1. Improper Generator Voltage
- 2. Frequency Voltage Relay Not Energizing (FVR)
Source: manual:Styles 2, 3 and T-200 New Manual.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.