HomeRepair guidesTransfer switch enclosures and some internal steel mounting

Transfer Switches - Eaton Cutler Hammer — Transfer switch enclosures and some internal steel mounting

A Transfer Switches - Eaton Cutler Hammer service procedure — check it applies to your exact model before use.

Browse Transfer Switches - Eaton Cutler Hammer generators & specs →

Procedure

  1. 3.8 Standards
  2. 4.1 General
  3. 4.2 Mounting Location
  4. 4.3 Unpackaging and Inspection
  5. Step 1: Carefully uncrate the transfer switch. If damage is visible,
  6. Step 2: Open the door and visually verify that there are no broken
  7. Step 3: A label on the door provides specifications for your trans-
  8. Step 4: Remove any braces or packing used to protect the trans-
  9. 4.4 Mounting Procedure
  10. Step 1: Mounting and cabling access is best provided by remov-
  11. 9.3 for cover removal instructions.
  12. Step 2: Gently maneuver the switch into its location using all of
  13. Step 3: Bolt the enclosure to the base. Use separate cleats
  14. Step 4: Tighten bolts to 50 ft-lbs (68 Nm).
  15. Step 5: Double check to ensure that all packing and shipping .
  16. 4.5 Power Cable Connections
  17. Step 1: Verify that the line and load cables comply with applica-
  18. Step 2: Verify that the transfer switch rated current and voltage
  19. Step 3: After the transfer switch is mounted, provide the conduit
  20. Step 4: Test all power cables before connecting them to the unit

Source: manual:Magnum ATS Instructions.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.