Transfer Switches - Eaton Cutler Hammer — Step 3: After the transfer switch is mounted, provide the conduit

A Transfer Switches - Eaton Cutler Hammer service procedure — check it applies to your exact model before use.

Browse Transfer Switches - Eaton Cutler Hammer generators & specs →

Procedure

  1. Step 4: Test all power cables before connecting them to the unit
  2. Step 5: Carefully strip the insulation from the power cables.
  3. Step 6: Tighten the cable lugs to the torque identified on the label
  4. Step 7: Make the necessary connections of any options using the
  5. Step 8: Connect the engine start wires to the logic connector
  6. 4.6 Voltage Selection Adjustment .
  7. 4.7 Mounting the Switching Device in the Drawout
  8. 4.8 Wiring
  9. 4.8.1 Engine Start Connection
  10. 4.8.2 ALARM CONTACTS (CLOSED TRANSITION ONLY)
  11. 5.1 General
  12. 25. An indicator window shows whether the switch is open or
  13. 3.2.2). An indicator window shows whether the switch is open
  14. 5.2 Automatic Transfer Switch
  15. 2. Open both switching devices
  16. 4. Verify source availability
  17. 5. Close switching device on available
  18. 1. Disconnect Logic Connectors
  19. 3. Verify "OPEN" flags
  20. 6.1 Installing a Drawout Switching Device

Source: manual:Magnum ATS Instructions.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.