Procedure
- 4.5 Power Cable Connections
- Step 1: Verify that the line and load cables comply with applica-
- Step 2: Verify that the transfer switch rated current and voltage
- Step 3: After the transfer switch is mounted, provide the conduit
- Step 4: Test all power cables before connecting them to the unit
- Step 5: Carefully strip the insulation from the power cables.
- Step 6: Tighten the cable lugs to the torque identified on the label
- Step 7: Make the necessary connections of any options using the
- Step 8: Connect the engine start wires to the logic connector
- 4.6 Voltage Selection Adjustment .
- 4.7 Mounting the Switching Device in the Drawout
- 4.8 Wiring
- 4.8.1 Engine Start Connection
- 4.8.2 ALARM CONTACTS (CLOSED TRANSITION ONLY)
- 5.1 General
- 25. An indicator window shows whether the switch is open or
- 3.2.2). An indicator window shows whether the switch is open
- 5.2 Automatic Transfer Switch
- 2. Open both switching devices
- 4. Verify source availability
Source: manual:Magnum ATS Instructions.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.