Procedure

  1. 4.6 Voltage Selection Adjustment .
  2. 4.7 Mounting the Switching Device in the Drawout
  3. 4.8 Wiring
  4. 4.8.1 Engine Start Connection
  5. 4.8.2 ALARM CONTACTS (CLOSED TRANSITION ONLY)
  6. 5.1 General
  7. 25. An indicator window shows whether the switch is open or
  8. 3.2.2). An indicator window shows whether the switch is open
  9. 5.2 Automatic Transfer Switch
  10. 2. Open both switching devices
  11. 4. Verify source availability
  12. 5. Close switching device on available
  13. 1. Disconnect Logic Connectors
  14. 3. Verify "OPEN" flags
  15. 6.1 Installing a Drawout Switching Device
  16. 6.1.1 Switching Device Positioning
  17. 6.1.2 Levering the Switching Device
  18. 6.2. Fixed Switching Device
  19. 6.3 Switching Device Operation
  20. 7.1 Operator Panel