Procedure
- 4.6 Voltage Selection Adjustment .
- 4.7 Mounting the Switching Device in the Drawout
- 4.8 Wiring
- 4.8.1 Engine Start Connection
- 4.8.2 ALARM CONTACTS (CLOSED TRANSITION ONLY)
- 5.1 General
- 25. An indicator window shows whether the switch is open or
- 3.2.2). An indicator window shows whether the switch is open
- 5.2 Automatic Transfer Switch
- 2. Open both switching devices
- 4. Verify source availability
- 5. Close switching device on available
- 1. Disconnect Logic Connectors
- 3. Verify "OPEN" flags
- 6.1 Installing a Drawout Switching Device
- 6.1.1 Switching Device Positioning
- 6.1.2 Levering the Switching Device
- 6.2. Fixed Switching Device
- 6.3 Switching Device Operation
- 7.1 Operator Panel
Source: manual:Magnum ATS Instructions.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.