HomeRepair guidesNo Load Engine Test;

Transfer Switches - Eaton Cutler Hammer — No Load Engine Test;

A Transfer Switches - Eaton Cutler Hammer service procedure — check it applies to your exact model before use.

Browse Transfer Switches - Eaton Cutler Hammer generators & specs →

Procedure

  1. Load Engine Test; or
  2. Disabled.
  3. Load Engine Test
  4. After the Time Delay Emergency to Normal timer
  5. The Time Delay for Engine Cool-Off (TDEC - Feature 4)
  6. Alternate operational tests may be possible depending upon
  7. General Order
  8. Catalog and/or Style Number of transfer switch.
  9. Actual location of transfer switch (type of facility, address,
  10. Company name.
  11. Name and position of individual representing company.
  12. Basic description of situation as it exists.
  13. Any results of problem solving steps taken and/or readings

Source: manual:ATC-300 Contactor 3-Position rev2010 IB01602024E.PDF. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.