HomeRepair guidesEngine Test and Set Generator Test) one time.

Transfer Switches - Eaton Cutler Hammer — Engine Test and Set Generator Test) one time.

A Transfer Switches - Eaton Cutler Hammer service procedure — check it applies to your exact model before use.

Browse Transfer Switches - Eaton Cutler Hammer generators & specs →

Procedure

  1. After the Time Delay Emergency to Normal timer (TDEN)
  2. The Time Delay for Engine Cool-Off (TDEC) will allow
  3. Alternate operational tests may be possible depending upon
  4. Style number of ATS, if applicable;
  5. Catalog number of ATS;
  6. Actual location of the ATS (type of facility, address, etc.);
  7. Company name and name and position of individual repre-
  8. Basic description of the situation as it exists; and
  9. Any results of the problem solving steps taken and/or read-

Source: manual:ATC-100 manual Contactor Based IB01602017E rev2009.PDF. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.