HomeRepair guides9.3 for cover removal instructions.

Transfer Switches - Eaton Cutler Hammer — 9.3 for cover removal instructions.

A Transfer Switches - Eaton Cutler Hammer service procedure — check it applies to your exact model before use.

Browse Transfer Switches - Eaton Cutler Hammer generators & specs →

Procedure

  1. Step 2: Gently maneuver the switch into its location using all of
  2. Step 3: Bolt the enclosure to the base. Use separate cleats
  3. Step 4: Tighten bolts to 50 ft-lbs (68 Nm).
  4. Step 5: Double check to ensure that all packing and shipping .
  5. 4.5 Power Cable Connections
  6. Step 1: Verify that the line and load cables comply with applica-
  7. Step 2: Verify that the transfer switch rated current and voltage
  8. Step 3: After the transfer switch is mounted, provide the conduit
  9. Step 4: Test all power cables before connecting them to the unit
  10. Step 5: Carefully strip the insulation from the power cables.
  11. Step 6: Tighten the cable lugs to the torque identified on the label
  12. Step 7: Make the necessary connections of any options using the
  13. Step 8: Connect the engine start wires to the logic connector
  14. 4.6 Voltage Selection Adjustment .
  15. 4.7 Mounting the Switching Device in the Drawout
  16. 4.8 Wiring
  17. 4.8.1 Engine Start Connection
  18. 4.8.2 ALARM CONTACTS (CLOSED TRANSITION ONLY)
  19. 5.1 General
  20. 25. An indicator window shows whether the switch is open or

Source: manual:Magnum ATS Instructions.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.