Transfer Switches - Eaton Cutler Hammer — 4.3 Unpackaging and Inspection
A Transfer Switches - Eaton Cutler Hammer service procedure — check it applies to your exact model before use.
Browse Transfer Switches - Eaton Cutler Hammer generators & specs →
Procedure
- Step 1: Carefully uncrate the transfer switch. If damage is visible, please contact your local Eaton sales representative or the factory.
- Step 2: Open the door and visually verify that there are no broken or damaged components or evidence of distorted metal or loose wires as a result of rough handling.
- Step 3: A label on the door provides specifications for your trans- fer switch. Verify that these specifications comply with your requirements.
- Step 4: Remove any braces or packing used to protect the trans- fer switch or internal components during shipping.
- 4.4 Mounting Procedure With the enclosed transfer switch equipment unpacked and ready for mounting, proceed with the following steps:
- Step 1: Mounting and cabling access is best provided by remov- ing side and rear covers (when applicable). See Section
- 9.3 for cover removal instructions.
- Step 2: Gently maneuver the switch into its location using all of the supplied lift brackets.
- Step 3: Bolt the enclosure to the base. Use separate cleats (Option 42 only) if Seismic Uniform Building Code (UBC)
Source: manual:Magnum ATS Instructions.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.