PSI (Power Solutions Intl) — Procedure 9
A PSI (Power Solutions Intl) service procedure — check it applies to your exact model before use.
Browse PSI (Power Solutions Intl) generators & specs →
Before you start
- NOTE:
Procedure
- 2) The cylinder head bolt will stretch and deform between 0.2~0.6mm after tightening.
- The bolt can’t be reuse if the length over 160.5mm.
- 3) Install the valve oil seal.
- NOTE:
- • The engine MUST be barred over three complete rotations before starting the
- engine once new cylinder heads are installed.
Source: manual:4.5L-Engine-Service-Manual-7610033-2.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.