PSI (Power Solutions Intl) — Procedure 8
A PSI (Power Solutions Intl) service procedure — check it applies to your exact model before use.
Browse PSI (Power Solutions Intl) generators & specs →
Before you start
- NOTE:
Procedure
- 1) Insert the seal valve into the valve guide pipe.
- 2) Install the intake valve and exhaust valve onto the cylinder head.
- 3) Install new cylinder head gaskets. Cylinder head gaskets cannot be reused.
- 4) Assemble the cylinder head to the engine block.
- 5) Thread the cylinder head bolts into the cylinder head.
- NOTE:
- • Leave the four cylinder heads loose at this time. Alignment of cylinder heads must
- be completed after installing intake pipe to ensure alignment to prevent coolant
- leaks. Reference 5.1.3. Steps to assemble air intake and exhaust system.
Source: manual:4.5L-Engine-Service-Manual-7610033-2.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.