PSI (Power Solutions Intl) 53L — Refilling the Cooling System
For the PSI (Power Solutions Intl) 53L.
Browse PSI (Power Solutions Intl) generators & specs →
Before you start
- Use of a fill pump is required to properly purge the system of air during a fill procedure. Coolant should be added to the overflow tank filler neck for top-off only. Failure to do so can result in engine damage.
Procedure
- Connect a coolant pump to the proper radiator fill fitting.
- Fill the system with fresh PSI-approved pre-mixed coolant.
- Disconnect the pump. Replace the radiator cap or overflow tank filler cap.
- Start the engine and run at 1800 RPM to thoroughly circulate the coolant and purge the system of air bubbles. Run for a minimum of 30 minutes.
- Shut the engine down and allow to cool.
Tools required
- Coolant pump
Specs & torque values
- PSI-approved pre-mixed coolant
Source: manual:56100039-11-53L-Operations-Maintenance-Manual.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.