HomeRepair guidesTiming Belt Installation

PSI HD 560001-R2 — Timing Belt Installation

For the PSI HD 560001-R2.

Browse PSI HD generators & specs →

Procedure

  1. 1. Note rotational direction marked on belt (CW as viewed from front of engine).
  2. 2. Route new belt starting on camshaft sprocket clockwise around and down to crankshaft sprocket while maintaining tension on belt.
  3. 3. Once lock from cam-to-crank of the belt teeth, slide left hand side of belt over tensioner pulley.
  4. 4. Loosen tensioner RH lock bolt and apply tension to belt, tighten RH tensioner lock bolt to specification.
  5. 5. Rotate engine over CW 2 full rotations and ensure timing belt alignment marks line up correctly as stated at start of procedure.

Specs & torque values

  • Timing belt rotational direction marked CW

Source: manual:7610001-0.998L-Service-Manual.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.