Home›Repair guides›Power Solutions International›Steps to assemble cylinder head

Power Solutions International — Steps to assemble cylinder head

Repair & overhaul

From a Power Solutions International service manual — check it applies to your exact model before use.

Browse Power Solutions International generators & specs →

Before you start

  • Alignment of cylinder heads must be completed after installing intake pipe to prevent coolant leaks

Procedure

  1. Insert the seal valve into the valve guide pipe
  2. Install intake valve and exhaust valve onto the cylinder head
  3. Install new cylinder head gaskets; gaskets cannot be reused
  4. Assemble cylinder head to the engine block
  5. Thread cylinder head bolts into the cylinder head
  6. Leave the four cylinder heads loose until intake pipe installed
  7. Align and level four cylinder heads with intake pipe, coplanarity < 0.07mm
  8. Tighten cylinder head bolts after alignment
  9. Bar engine over three complete rotations before starting after new cylinder heads

Specs & values

  • Coplanarity requirement < 0.07mm, theoretical value ≯ 0.10mm
  • Cylinder head bolt tightening sequence 3-2-4-1
  • Tighten per bolt pre-tightening order in Figure 18

Source: Power Solutions International service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Power Solutions International repair guides →