Home›Repair guides›Power Solutions International›Starter, Remove and Install

Power Solutions International — Starter, Remove and Install

Repair & overhaul

From a Power Solutions International service manual — check it applies to your exact model before use.

Browse Power Solutions International generators & specs →

Procedure

  1. Disconnect negative battery cable.
  2. Remove cable connections (1) and (2) from starter.
  3. Remove ground cable (4).
  4. Option A: remove fastening nut (3) and bolt (5).
  5. Option B: remove the two bolts and nuts through starter and transmission.
  6. Remove starter.
  7. Install: Option A torque fastening bolts to 35 ft/lbs; Option B torque to 58 ft/lbs.
  8. Connect ground cable to 106 in/lbs; install cables; attach negative battery cable.

Specs & values

  • Option A 35 ft/lbs
  • Option B 58 ft/lbs
  • Ground cable 106 in/lbs

Source: Power Solutions International service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Power Solutions International repair guides →