Home›Repair guides›Power Solutions International›Intake Manifold Replacement - Installation

Power Solutions International — Intake Manifold Replacement - Installation

Repair & overhaul

From a Power Solutions International service manual — check it applies to your exact model before use.

Applies to: General Motors 8.8L engine

Before you start

  • The intake manifold gaskets are not reusable
  • DO NOT reuse intake manifold bolts; install NEW bolts

Procedure

  1. Install the splash shield and ensure it snap fits between the cylinder heads.
  2. Install the NEW intake manifold end seals and side gaskets.
  3. Ensure gasket tabs align with hole in head gasket and slot in end seals.
  4. Install the intake manifold.
  5. Apply engine oil to the bolts of the intake manifold.
  6. Install the NEW intake manifold bolts.
  7. Tighten in sequence using four passes: 40, 80, 120, 154 in-lbs.
  8. Install the fuel rail and studs; tighten studs to 12 Nm (106 lb in).

Specs & values

  • Intake manifold bolts 40 → 80 → 120 → 154 in-lbs
  • Fuel rail studs 12 Nm (106 lb in)

Source: Power Solutions International service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Power Solutions International repair guides →