Home›Repair guides›Power Solutions International›Cylinder Heads Assembly Procedure

Power Solutions International — Cylinder Heads Assembly Procedure

Repair & overhaul

From a Power Solutions International service manual — check it applies to your exact model before use.

Browse Power Solutions International generators & specs →

Before you start

  • The engine MUST be barred over three complete rotations before starting once new cylinder heads are installed.
  • Cylinder head gasket and valve stem gland can only be used once.

Procedure

  1. Assemble cylinder head bolt; bolts allowed 3 uses, then replace.
  2. Coat short thread end with anaerobic thread locking agent 262.
  3. Clean the threaded hole on the cylinder body.
  4. Tighten the bolts to (20+10) N·m.
  5. Assemble cylinder head gasket (use once, replace on repair).
  6. Wipe cylinder liner wall, coat with clean oil, place gasket on pin holes.
  7. Assemble valve stem gland (use once); lubricate lip.
  8. Clean cylinder head and assemble with pin-surface positioning.
  9. Assemble clamping block and install cylinder head bolts.
  10. Tighten main bolts to 60±6 N·m; tighten auxiliary nuts to 25±3 N·m.
  11. Turn nuts and main bolts 120°±5° in sequence, twice each.
  12. Bar engine over three complete rotations before starting.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Cylinder head main bolts 60±6 N·m
  • Cylinder head auxiliary nuts 25±3 N·m

Source: Power Solutions International service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Power Solutions International repair guides →