Home›Repair guides›Power Solutions International›Adjust Intake and Exhaust Valve Clearance

Power Solutions International — Adjust Intake and Exhaust Valve Clearance

Adjustments · Valve train / rocker arms

From a Power Solutions International owner's manual — check it applies to your exact model before use.

Browse Power Solutions International generators & specs →

Before you start

  • Measure and adjust while engine is cold.

Procedure

  1. Remove wiring harness from starter and remove starter.
  2. Install barring over tool (part #Z52500309).
  3. Remove timing access cover to expose flywheel timing marks; remove all twelve valve covers.
  4. Using a 1/2 in ratchet, rotate engine until cylinder 1 is at TDC.
  5. Check rockers; adjust valves marked blue when cylinder 1 is at TDC.
  6. Set lash to 0.55 mm (0.022 in) intake and 1.00 mm (0.039 in) exhaust.
  7. Rotate crankshaft 360 degrees to TDC #1 again and check remaining valves.
  8. Reinstall valve covers.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Intake 0.55 mm (0.022 in)
  • Exhaust 1.00 mm (0.039 in)

Source: Power Solutions International owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Power Solutions International repair guides →