Power Solutions International 560001-R2 — Valve Adjustment

Adjustments · Intake/exhaust valves, camshaft timing belt

For the Power Solutions International 560001-R2, from the Power Solutions International service manual.

Browse Power Solutions International generators & specs →

Procedure

  1. Loosen alternator bolts and remove fan belt.
  2. Remove bolts (4) from water pump pulley and remove water pump pulley.
  3. Remove driving pulley bolts and remove drive pulley.
  4. Remove six timing cover bolts and remove the timing cover.
  5. Turn flywheel to align dot mark on cam timing pulley with arrow mark on rear cover; cylinder #1 is at TDC.
  6. Adjust intake/exhaust valves on cylinder 1, intake valves on cylinder 2 and exhaust valve on cylinder 3.
  7. Turn cam timing pulley to 180 degrees (number 4 will be at TDC).
  8. Adjust intake/exhaust valves on cylinder 4, exhaust valve on cylinder 2, and intake valve on cylinder 3.
  9. Use adjustment screw (1) and locking nut (2) with thickness gauge at highest rocker arm position; lock adjusting screw.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Intake 0.13-0.18 mm (Cold), 0.23-0.28 mm (Warm)
  • Exhaust 0.13-0.18 mm (Cold), 0.23-0.28 mm (Warm)

Source: Power Solutions International service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Power Solutions International repair guides →