Power Solutions International 560001-R2 — Oil Pan Installation

Repair & overhaul

For the Power Solutions International 560001-R2, from the Power Solutions International service manual.

Browse Power Solutions International generators & specs →

Procedure

  1. Remove any and all debris from below the engine block.
  2. Apply HZ-1213 silicone sealant to the oil pan gasket and crank end cover.
  3. Install oil pan and torque bolts to 7-9 Nm in sequence (1-18).
  4. Torque the three crank end cover bolts to 7 Nm.
  5. Cut off any sealant extruding from the oil pan and crank end cover.
  6. Torque the oil drain plug to 4 Nm.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Oil pan bolts 7-9 Nm (sequence 1-18)
  • Crank end cover bolts 7 Nm
  • Oil drain plug 4 Nm

Source: Power Solutions International service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Power Solutions International repair guides →