Perkins — Bridge Piece Adjustment
A Perkins service procedure — check it applies to your exact model before use.
Browse Perkins generators & specs →
Before you start
- Disconnect the batteries and any other power that can start the engine.
- The bridge piece must be adjusted before the valve adjustment is made.
- Check that there is a clearance between the bridge piece and the inlet and exhaust rockers.
- When the contact is made with the valve, the valve must not move. Only the gap between the valve tip and the bridge piece must be removed.
Procedure
- Remove the setscrews (A1). Remove the rocker cover (A2) and discard the cover joint (A3).
- Rotate the engine to the required position using the inspection hole (B) in the flywheel housing to find TDC.
- Check that there is clearance on both valves.
- Loosen the lock nuts on each of the bridge pieces (C2).
- Turn the adjuster (C3) out until the fixed side of the bridge piece rests on its valve.
- Hold the top edge of the bridge piece (C1) and turn the adjuster screw (C3) down until it contacts the valve.
- Tighten the lock nut (C2) to a torque of 50 Nm (35 lbf ft). Do not allow the adjuster screw (C3) to move.
Tools required
- engine cranking device (part number SE253)
Specs & torque values
- Lock nut torque: 50 Nm (35 lbf ft)
Source: manual:4006-23 series_TPCD1508-000-en.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.