Perkins — How to Adjust the Boom Extend/Retract Cables
Adjustments
From a Perkins service manual covering: 404F-22, 5046D, 5606A, 804D-33, S8015-12264, S8016H-13642, S80X15-12264, S80X16H-13642, S8515-12264, S8516H-13642. Check it applies to your exact model before use.
Browse Perkins generators & specs →
Procedure
- Start the engine from ground controls, raise the boom to horizontal, fully retract the boom, stop the engine.
- Remove the boom end cover retaining fasteners and remove the cover.
- Inspect the threaded ends of the boom extend cables; threads must be clean and undamaged.
- Loosen the retract cable adjustment nut at the platform end of boom tube #1. Do not remove it.
- Loosen the nylock nuts and jam nuts on the cable tension equalizer bracket.
- Adjust the extend cable adjustment nut to obtain 6 3/8 inches/16.2 cm to 6 1/2 inches/16.5 cm between boom tube #2 and boom tube #3.
- Extend the boom until there is approximately 3 feet / 1 m of travel left. Do not fully extend.
- Torque the retract cable adjustment nut to 32-36 ft lbs / 43-49 Nm using gentle, steady torque.
Tools required
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Specs & values
- 6 3/8 inches / 16.2 cm to 6 1/2 inches / 16.5 cm between boom tube #2 and #3
- Retract cable adjustment nut 32-36 FridayParts $15.99 ft lbs / 43-49 Nm
Source: Perkins service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.