HomeRepair guidesProcedure 9

Perkins — Procedure 9

A Perkins service procedure — check it applies to your exact model before use.

Browse Perkins generators & specs →

Procedure

  1. 2. Install the new O-ring (10) onto the fuel injection
  2. pump. Position the fuel injection pump onto the
  3. front housing. Install the setscrews (13). Tighten
  4. the setscrews (13) to a torque of 25 N·m (18 lb ft).
  5. 3. Install the setscrew (15) and the bracket (11)
  6. onto the cylinder block if the bracket was
  7. previously removed. Ensure that the bracket (11)
  8. supports the fuel injection pump without applying
  9. any other external force on the fuel injection
  10. pump. Tighten the setscrew (15) to a torque of
  11. 44 N·m (32 lb ft).
  12. 4. Install the bolt (12) and the nut (14).
  13. g01011369
  14. Illustration 19
  15. Typical example

Specs & torque values

  • 44 N·m
  • 25 N·m
  • 24 N·m

Source: manual:Perkins-1103-1104-Series-Workshop-Manual.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.