HomeRepair guidesNOTICE

Perkins — NOTICE

A Perkins service procedure — check it applies to your exact model before use.

Browse Perkins generators & specs →

Procedure

  1. 1. Ensure that the No. 1 cylinder is at top dead
  2. center on the compression stroke. Refer to the
  3. Testing and Adjusting Manual, “Finding Top
  4. Center Position for No. 1 Piston”.
  5. g00956204
  6. Illustration 11
  7. Typical example
  8. 2. Loosen the locking screw (5). Rotate the spacer
  9. (6) in order to allow the locking screw (5) to
  10. tighten against the shaft of the fuel injection
  11. pump. Rotate the fuel injection pump gear in a
  12. counterclockwise direction in order to remove
  13. the backlash. Tighten the locking screw (5) to a
  14. torque of 17 N·m (13 lb ft).
  15. Note: The locking screw (5) must be tightened in

Tools required

  • 7. Use a suitable puller in order to remove the fuel

Specs & torque values

  • 17 N·m

Source: manual:Perkins-1103-1104-Series-Workshop-Manual.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.