Perkins — Disassembly and Assembly Section
A Perkins service procedure — check it applies to your exact model before use.
Browse Perkins generators & specs →
Before you start
- Note: The spacer (6) must be correctly positioned
- Note: Ensure that the mating surfaces of the fuel
Procedure
- 2. Install the new O-ring (10) onto the fuel injection
- pump. Position the fuel injection pump onto the
- front housing. Install the setscrews (13). Tighten
- the setscrews (13) to a torque of 25 N·m (18 lb ft).
- 3. Install the setscrew (15) and the bracket (11)
- onto the cylinder block if the bracket was
- previously removed. Ensure that the bracket (11)
- supports the fuel injection pump without applying
- any other external force on the fuel injection
- pump. Tighten the setscrew (15) to a torque of
- 44 N·m (32 lb ft).
- 4. Install the bolt (12) and the nut (14).
- g01011369
- Illustration 19
- Typical example
- Note: Ensure that the mating surfaces of the fuel
- injection pump gear and the shaft of the fuel
- injection pump are clean. Lubricate the threads of
- the shaft for the fuel injection pump. The nut (8)
- must turn freely until contact is made with the fuel
Specs & torque values
- 24 N·m
- 44 N·m
- 12 N·m
Source: manual:Perkins-1103-1104-Series-Workshop-Manual.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.