HomeRepair guidesNOTICE

Perkins — NOTICE

A Perkins service procedure — check it applies to your exact model before use.

Browse Perkins generators & specs →

Before you start

  • Note: The locking screw (6) must be tightened in
  • Note: The removal procedure is identical for the

Procedure

  1. 2. Remove the setscrews (2) from the cover (1).
  2. 3. Remove the cover (1).
  3. Installation Procedure
  4. NOTICE
  5. Keep all parts clean from contaminants.
  6. Contaminants may cause rapid wear and shortened
  7. component life.
  8. Note: The installation procedure is identical for the
  9. four cylinder and the three cylinder engines. The
  10. illustration shows the four cylinder engine.
  11. g01011111
  12. Illustration 10
  13. Typical example
  14. 1. Thoroughly clean all of the inner surfaces of the
  15. cover (1) for the fuel injectors.
  16. 2. Install the cover (1).
  17. 3. Install the setscrews (2) for the cover (1). Tighten
  18. the setscrews (2) to a torque of 9 N·m (7 lb ft).
  19. i01940997
  20. Fuel Injection Pump - Remove

Tools required

  • 7. Use a suitable puller in order to remove the fuel

Specs & torque values

  • 31 N·m
  • 17 N·m
  • 9 N·m

Source: manual:Perkins-1103-1104-Series-Workshop-Manual.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.