Perkins 1106 — Electronic Control Module - Remove and Install
Repair & overhaul
For the Perkins 1106, from the Perkins service manual.
Applies to: Perkins 1106, Perkins 1106D engine
Before you start
- Avoid damage to connector pins during harness installation
Procedure
- Isolate electrical and fuel supply to the engine.
- Cut cable tie; disconnect OEM harness from the ECM.
- Cut cable straps; disconnect engine harness from the ECM.
- Mark plastic tube assemblies; place container; disconnect and plug tube assemblies.
- Loosen bolts and remove ECM assembly; note orientation.
- Remove bolts and washers; note ground strap position.
- If required, disassemble ECM: remove isolation mounts, spacers, connectors, O-ring seals and brackets.
- On installation, program replacement ECM if fitted.
- Assemble ECM: install new O-ring seals to connectors and tighten to 18.5 N·m.
- Install brackets; tighten torx screw and bolt to 20 N·m.
- Install isolation mounts and spacers; install washers and bolts.
- Install ECM assembly to mounting bracket; tighten bolts to 22 N·m.
- Connect plastic tube assemblies, engine harness (5 N·m) and OEM harness (5 N·m).
- Restore fuel and electrical supply; prime the fuel system.
Specs & values
- 18.5 N·m (13.6 lb ft) connectors
- 20 N·m (14 lb ft) brackets
- 22 N·m (16 lb ft) ECM bolts
- 5 N·m (3 lb ft) harness fasteners
Full service-parts list: Perkins 1106 →, Perkins 1106D engine →
Source: Perkins service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.