Perkins 1104 — Fuel Injection Pump - Install
Maintenance
For the Perkins 1104, from the Perkins service manual.
Applies to: Perkins 1104, Perkins N H1 (Engine) engine
Procedure
- If previously disassembled, install fuel transfer pump and position sensor to fuel injection pump.
- Check fuel injection pump timing using timing tool.
- If timing lost, reset timing: loosen locking screw, slide spacer to Z1, tighten to 9 N·m (80 lb in).
- Position timing tool onto shaft, align lever with key slot, engage lever.
- Rotate shaft until pin engages hole.
- Loosen locking screw, slide spacer to Z2, tighten against shaft to 9 N·m (80 lb in).
- Remove timing tool.
- Inspect bore in front housing for damage.
- Lubricate new O-ring seal and install onto fuel injection pump.
- Align holes and install pump to front housing.
- Install bolts and new sealing washers; tighten to 25 N·m (18 lb ft).
- Install fuel injection pump gear.
- Install front cover.
- Install support bracket and bolts; tighten bolt 18 to 44 N·m (32.5 lb ft), bolts 16 to 22 N·m (16 lb ft).
- Install tube assemblies and fuel injection line; tighten banjo bolts to 22 N·m (16 lb ft).
Tools required
- 21825576 Crankshaft Turning Tool Amazon
- 27610291 Barring Device Housing Amazon
- 27610289 Gear Amazon
- 27610212 Camshaft Timing Pin Amazon
- 27610211 Crankshaft Timing Pin Amazon
- 27610302 Fuel Injection Pump Timing Tool Amazon
- 21820221 POWERPART Rubber Grease Amazon
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Specs & values
- 9 N·m (80 lb in)
- 25 N·m (18 lb ft)
- 44 N·m (32.5 lb ft)
- 22 N·m (16 lb ft)
- 15 N·m (11 lb ft)
Full service-parts list: Perkins 1104 →
Source: Perkins service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.