Northern Lights M175C2 — Shutdown

Operation · Engine/genset

For the Northern Lights M175C2, from the Northern Lights operator's manual.

Applies to: Northern Lights M175C2

Before you start

  • Do not turn battery switch OFF while engine is running.

Procedure

  1. Unload generator and run three to five minutes for cool down.
  2. Turn Engine Control Switch to OFF.
  3. Close seacock and fuel valves for extended shutdown.
  4. Place battery switch OFF only after engine stops.

Full service-parts list: Northern Lights M175C2 →

Source: Northern Lights operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Northern Lights repair guides →