Home›Repair guides›MTU›Installing cylinder liner

MTU 8V 2000 C / 8V 2000 G — Installing cylinder liner

Installation · Cylinder liner / crankcase

For the MTU 8V 2000 C / 8V 2000 G, from the MTU service manual.

Browse MTU generators & specs →

Before you start

  • Check sealing rings are correctly positioned in crankcase and replace
  • In event of slight cavitation on outer wall, install liner offset by 90°

Procedure

  1. Check cylinder liner repair stage and assign per crankcase data sheet.
  2. Coat new sealing rings with petroleum jelly and insert into crankcase grooves.
  3. Fit new Tombak ring on cylinder liner collar seat.
  4. Wipe liner at lower fit and chamfer inclination; coat with petroleum jelly.
  5. Insert cylinder liner in same installation position per markings.
  6. Insert screws of insertion tool into threaded bores for cylinder head screws.
  7. Fit pressure plate on liner and turn spindle clockwise.
  8. Remove installation tool and measure liner I.D.

Tools required

  • Installation tool for cylinder liner Amazon
  • Bore gauge and dial gauge Amazon
  • Measuring plate and spacer tubes Amazon

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Cylinder head screws for measuring plate 50 Nm; projection difference between 4 measuring points max. 0.02 mm

Source: MTU service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More MTU repair guides →