Home›Repair guides›MQ Power›Pitch Cable Installation

MQ Power — Pitch Cable Installation

Installation · Blade pitch cable

From a MQ Power owner's manual covering: B-43-H8, B-44-BS8, B-44-H8, B-44-R7. Check it applies to your exact model before use.

Browse MQ Power generators & specs →

Procedure

  1. Expose the pitch cable to maximum by setting handle pitch to the no pitch position.
  2. Lock the spring in the compressed position by releasing the blade pitch adjustment trigger.
  3. Remove one brass set nut from the blade pitch cable end.
  4. Thread the second brass set nut toward the cable as far as possible.
  5. Insert the cable end through the yoke eyelet.
  6. Tighten the first brass set nut by hand to remove all cable slack.
  7. Tighten the second brass set nut against the yoke boss with a wrench.
  8. Finish tightening the first brass set nut against the yoke boss.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Source: MQ Power owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More MQ Power repair guides →