Mitsubishi — Test operation (starting and stopping)
Operation · Engine
From a Mitsubishi owner's manual — check it applies to your exact model before use.
Browse Mitsubishi generators & specs →
Before you start
- Remove expansion tank cap only after engine cools to room temperature.
Procedure
- Start the engine.
- Operate at low idling speed (600 to 650 min-1) under no load for 5 to 10 minutes for warm-up.
- Stop the engine.
- Do not operate engine for 30 minutes.
- Check engine and surrounding area for leakage of fuel, engine oil and coolant.
- After 30 minutes check oil level with oil level gage; add oil if low.
- Open expansion tank cap and check coolant level.
- If coolant level is low, add coolant to specified level.
Specs & values
- 600 to 650 min-1
Source: Mitsubishi owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.