Mitsubishi GS16R-PTK — Connecting Rod Cap - Install
Installation
For the Mitsubishi GS16R-PTK, from the Mitsubishi service manual.
Applies to: Mitsubishi GS16R-PTK, Mitsubishi GS16R-PTK engine
Before you start
- [Wet] 2-time tightening method.
Procedure
- Install the lower connecting rod bearing, aligning its lug with the lug slot of the cap.
- Apply engine oil on bolt threads, seating surfaces, and sliding surface.
- Make sure matching numbers are on the same side, then install the cap.
- Hand tighten the connecting rod bolts.
- Measure connecting rod end play and adjust within standard.
- Tighten connecting rod bolts to specified torque, loosen completely, and tighten again.
Tools required
- Connecting rod gauge P/N 37791-01500 (0.5 mm) Amazon
- Connecting rod gauge P/N 37791-01600 (0.6 mm) Amazon
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Specs & values
- 637 ± 31.9 N·m {65 ± 3.25 kgf·m} [470 ± 23.5 lbf·ft]
- Snug torque upper (CS) 245 ± 12.3 N·m
- Snug torque lower (CL) 294 ± 14.7 N·m
Source: Mitsubishi service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.