HomeRepair guidesINSTALLATION

Mitsubishi — INSTALLATION

A Mitsubishi service procedure — check it applies to your exact model before use.

Browse Mitsubishi generators & specs →

Before you start

  • Note: After installation, keep the sealed area

Procedure

  1. 1. Apply a 3 mm diameter bead of FIPG to the
  2. indicated surface of the water outlet fitting
  3. Specified sealant: Permatex Ultra Grey Gasket
  4. Maker pt# 82194 or equivalent
  5. 2. Install the housing quickly, (within 15 minutes)
  6. while the sealant is wet, and tighten the bolts to
  7. the specified torque.
  8. Note: After installation, keep the sealed area
  9. away from the coolant for approximately one hour.
  10. 1. Check that the rubber ring is undamaged and
  11. seated correctly in the thermostat flange.
  12. 2. Install the thermostat as shown in the illustration.
  13. The jiggle valve must be at the uppermost
  14. position.

Specs & torque values

  • 82194

Source: manual:Mitsubishi-2.0L-2.4L-Service-Manual-106992-Revision-D.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.